The brand new mission – named Abu Dhabi World Markets JV Entity (ADGM) – will first develop two mining websites with a mixed capability of 250 megawatts (MW) of mining energy, in keeping with a press launch. The websites can be powered by extra power in Abu Dhabi, growing the bottom load and sustainability of that Center Japanese capital’s energy grid, the assertion continued. The required mining tools and infrastructure for every web site has already been ordered and development is at the moment underway.