
Genesis Digital Property (GDA), one of many worlds largest Bitcoin miners when it comes to hash price, has introduced the inauguration of its new mining facility located within the northern reaches of Sweden, in keeping with a press launch despatched to Bitcoin Journal. The information middle’s capability is at present 8 megawatts (MW), with plans for additional enlargement “within the close to future,” and has been operational since June 2023.
The brand new facility is strategically positioned close to the 417 MW Porjus Hydroelectric Energy Station, recognized for its carbon-free electrical energy manufacturing. GDA goals to reap the benefits of this renewable vitality supply for its Bitcoin mining operations.
“With ample vitality sources, a pro-innovation surroundings, and a powerful academic system that leads to an awesome tradition of innovation, we imagine that Sweden is likely one of the greatest nations on the planet the place to mine bitcoin and anticipate to additional make investments on this stunning area transferring ahead,” commented Tim Carra, Head of Nordic Operations at GDA.
GDA has collaborated with a neighborhood firm assist to supervise the day-to-day operations of the brand new facility. The power, which was as soon as a standard information middle, marks GDA’s third enterprise in Sweden inside a three-year span, together with a greenhouse information middle pilot launched in 2020.
“Our enlargement of amenities within the Nordics is a testomony to our unwavering dedication to using inexperienced vitality sources,” stated Abdumalik Mirakhmedov, Government President and Co-Founding father of GDA. “We intention to guide the bitcoin mining business by setting an instance for different gamers by minimizing our environmental affect.”






